It all began when the aluminium system formworkds manufacturer were established in Malaysia in the early 90's. An excellent idea to support local high rise building construction, a good and logical system which allow each floor to be built within a week would also make a lot of dollar sense but then the performance of relase failed miserably. A lot of sticky and corrosive problem on formwork and caused troublesome for finishing process such as structure cracking, concrete surface very rough, honeycomb issue on concrete surface and etc. Arotech (PG) Sdn Bhd were called in to provide solution.